Workout program
The 5/3/1 Program
Jim Wendler's 5/3/1 is the most successful intermediate strength template ever written. Each cycle is four weeks: 3×5, 3×3, 5/3/1 (one all-out top set), then deload. Built around squat, bench, deadlift, and overhead press.
5/3/1 uses 90% of your true 1RM as the training max, so the plan stays short of an all-out max single. The smaller jumps are why people can run it for a long block.
A fit for: Intermediate to advanced lifters who've outgrown linear progression.
Days: 4 days/week.
Built-in periodization, with smaller jumps that are easier to repeat
Conservative loads keep form sharp
Built-in deload weeks prevent burnout
Highly customizable assistance work (BBB, Boring But Big, etc.)
Slower progression than 5×5 in the first year
Requires an accurate training max: too high and it breaks
Less direct hypertrophy than PPL or Upper/Lower
Week 1: 5s (Main lift: 65% × 5, 75% × 5, 85% × 5+): Day 1: Overhead Press, Day 2: Deadlift, Day 3: Bench Press, Day 4: Squat
Week 2: 3s (Main lift: 70% × 3, 80% × 3, 90% × 3+): Same lift order
Week 3: 5/3/1 (Main lift: 75% × 5, 85% × 3, 95% × 1+): Same lift order. 1+ means as many reps as possible.
Week 4: Deload (Main lift: 40% × 5, 50% × 5, 60% × 5): Light week. Full recovery before next cycle. Increase TM by 5 lb upper / 10 lb lower.
Set your training max at 90% of your true 1RM. Track every AMRAP (As Many Reps As Possible) set: beating your previous rep count is the actual measure of progress.